|
|
|
|
|
|
MMMM d, yyyy |
|
|
The project consists of building two approximately 23km-long diversion channels as well as building two bridges and water control structures, a 24-kilovolt distribution line, and adjusting surrounding highway infrastructure.
» Read More
The fuel channel and feeder replacement contract is valued at $475 million.
» Read More
Hugo Blasutta, president and CEO of WSP in Canada, will leave the corporation at the end of the year.
» Read More
|
|
|
|
The sole Canadian representative is Zoran Markovic, P.Eng., leader of the buildings practice in Arup Canada.
» Read more
|
WSP has achieved, or is predicted to achieve, strong results for energy and water efficiency, and waste diversion in its new office space.
» Read more
|
A net-positive office building in Waterloo, Ont. optimizes both passive and active energy sustainability features.
» Read more
| |
|
|
For more events click here.
» Read more
June 23-27, 2018
Location: Hilton Americas, Houston, TX
» Read more
June 27-29, 2018
Location: New York Marriott Marquis, NYC
» Read more
July 18, 2018
Location: The Terminal City Club, Vancouver
» Read more
July 30-August 3, 2018
Location: Quebec City
» Read more
|
|
| |