|
|
|
|
|
September 25, 2019 |
|
|
The tunnels are 4.4km and 1.6km long respectively and 3m in diameter each, adding 43,600 cubic-metres of storage.
» Read more
The total estimated capital costs of the projects on the pipeline, including projects in pre-transaction and the transaction phase, is over $65 billion.
» Read more
It becomes the first century-old building in North America to obtain triple Platinum certification having already earned BOMA BEST Platinum and WIRED Platinum certifications.
» Read more
|
|
|
|
At Schneider Electric, we have put our decades of arc flash prevention knowledge into designing and testing ArcBlok™ from the ground up. An innovative protection system helps contain and extinguish a line side arc flash event in less than one cycle, reducing potential damage to equipment. With ArcBlok™ arc isolation is always on and ready to do its job – helping to keep electricians and equipment safe. Get to know more about this gamechanger in electrical equipment protection.
» Learn more |
|
|
|
Electro-Breeze’s products will be rebranded under Fresh-Aire UV or carry the new “Electro-Breeze by Fresh-Aire UV” brand.
» Read more
|
The book details how Building Information Modelling is being deployed in the planning, design, construction and future operation of the Istanbul New Airport.
» Read more
|
The first two projects are in Sarnia and Brockville.
» Read more
| |
|
|
September 25-26
Location:
Hyatt Regency, Toronto
» Read more
September 30 – October 4
Location:
Quebec City Convention Centre
» Read more
October 8
Location:
Marriott Eaton Centre, Toronto
» Read more
October 16-18
Location:
Hotel Omni Mont Royal, Montreal
» Read more
October 26-27
Location: Delta Ottawa City Centre
» Read more
October 27-29
Location: Delta Ottawa City Centre
» Read more
November 18-19
Location: Sheraton Centre, Toronto
» Read more
December 4-6
Location:
Metro Toronto Convention Centre
» Read more
February 3-5, 2020
Location: Orange County Convention Center, Orlando, FL
» Read more
|
|
| |