|
|
|
|
|
|
|
@{mv_date_MMM d, yyyy}@ |
|
|
The construction is the final phase of a three-stage, $32-million project to scale up the Bloorview Research Institute, which focuses on childhood disability research.
» Read more
The new act is designed to make the province’s skilled trades and apprentice system easier to navigate, as well as more accessible.
» Read more
The International Institutions and Degrees Database (IIDD) provides up-to-date information about engineering programs from over 140 countries around the world.
» Read more
Design work includes the Queens Quay East Extension and Cherry Street portal as part of the Waterfront East Light Rail Transit.
» Read more
|
|
|
|
Victaulic offers M11 compliant assemblies capable of accommodating up to 4” / 102mm of dynamic movement caused by differential settlement, seismic events or thermal movement. We work to minimize your risk and maximize your certainty.
» Visit dynamicmovementjoint.com to learn more |
|
|
|
Vikas Anand joins the U.S. and Canada sales organization after leading the Danfoss Cooling business in Asia-Pacific and India.
» Read more |
|
The New York City-based firm as hired Rebecca Jones as Principal and Cori Kwitkin as Associate Principal.
» Read more |
|
|
|
As the PVC shortage continues, Champion Fiberglass® has short lead times and competitive pricing to keep projects on track.
Across many applications, projects using
fiberglass conduit benefit from:
-
Lower installation costs
-
Light weight
-
Superior compression and impact strength
» Visit victaulic.com to learn more. |
|
|
|
Digital Realty, a premier data center builder, wanted to enhance its data center performance with a medium-voltage distribution system that would reduce generator and uninterruptible power supply run times. S&C delivered a highly reliable, versatile, and low-maintenance medium-voltage distribution system that enhanced the provider’s data center builds. S&C’s remote supervisory Vista® Underground Distribution Switchgear helped reduce costs by 35%-45% compared to an equivalent metal-clad breaker gear and supported automatic system restoration.
» Read the data center case study at: sandc.com/vista-case21 |
|
|
|
|
|
| |