|
 |
 |
|
 |
|
@{mv_date_MMM d, yyyy}@ |
|
|
The provincial government has set the 2022-2032 QIP at $142.5 billion, representing a $7.5-billion increase over the previous plan.
» Read more
The project involves six low-rise (three- to four-storey) supportive-housing MURBs in the Lower Mainland, Capital Regional District and Southern Interior.
» Read more
The Association of Professional Engineers and Geoscientists of Alberta’s election results take effect with its next annual general meeting (AGM) on Apr. 22.
» Read more
|
|
|
|
An electrical engineer based in Quebec City, she has dedicated her career to power system analysis in transmission and distribution systems.
» Read more
|
Morrison Hershfield served as prime consultant for the new United Boulevard Recycling and Waste Centre, which opened to the public last month.
» Read more
|
She will help clients integrate technology and navigate change management in the context of infrastructure ownership and public service provision.
» Read more
|
|
|
|
April 20
Location: International Centre, Mississauga, Ont.
» Read more
April 28
Location: Metro Toronto Convention Centre
» Read more
May 11-13
Location: Beanfield Centre, Toronto
» Read more
May 12-14
Location: Halifax Marriott Harbourfront Hotel
» Read more
|
|