|
|
|
|
|
|
|
@{mv_date_MMM d, yyyy}@ |
|
|
“Highlighting successes is a good way to demonstrate leadership in the transition to a low-carbon economy,” said CaGBC president and CEO Thomas Mueller.
» Read more
The firm is working with Bird Construction on a progressive design-built contract for the $225-million project, the largest-ever capital investment in Strathmore.
» Read more
The fund aims to bring more Indigenous voices, values, perspectives and ways of knowing, being and doing into the building design and architecture professions.
» Read more
|
|
|
|
Effective Aug. 1, he will succeed current CEO François Plourde, who is set to retire at the end of the year after ensuring a smooth transition.
» Read more
|
A well-drafted services agreement can help prevent scope creep, but there may still be difficulties navigating the power imbalance between consultant and client.
» Read more
|
Earlier in the seasoned executive’s career, she became Canada’s first female licensed shift manager and nuclear plant manager.
» Read more
| |
|
|
GeoVerra users can easily access new data digitally for a total, immersive and accurate 3-D view of objects and surroundings for their projects.
» Read more |
|
It includes a quartz lamp, magnetic mounting bracket with anti-vibration coating, remote power supply and 90-degree low-profile electrical connector.
» Read more |
|
TOA Canada has released the MW-41BT, its second-generation audio interface, with a control panel that enables enhanced connectivity.
» Read more |
|
|
|
|
|
| |