|
|
|
|
|
@{mv_date_MMM d, yyyy}@ |
|
|
The infrastructure consulting firm is part of the Ontario Transit Group team, as selected by Infrastructure Ontario (IO) and Metrolinx.
» Read more
Stantec’s project enables YYC to be self-sufficient in recycling spent glycol and removes the chemical treatment burden from the municipal government.
» Read more
Associated Engineering collaborated with the city of Edmonton to design the largest system of its kind in Canada, powered by renewable energy.
» Read more
|
|
|
|
Mikrofill 3 is the most advanced, “direct-type” pressurization unit available for sealed, low-pressure hot-water (LPHW) and chilled-water (CHW) commercial and multifamily residential applications. Able to fill any heating or chilled water system from empty without the use of a pump, the product also delivers commercial backflow protection with no RPZ valves, while also providing comprehensive electronic pressure management. Mikrofill 3 hydronic system pressurization unit has been fully certified by ASSE International through a special LEC to the standard ASSE LEC 2009-2021. The certification clears the way for this innovative device to now be specified and installed on hydronic heating and cooling applications throughout North America.
» Learn more |
|
|
|
The Scarborough Transit Connect team comprises Aecon Infrastructure Management, FCC Construccion and Mott MacDonald Canada.
» Read more
Hedgehog Technologies led project management, engineering and co-ordination of logistics, with community training programs supporting long-term maintenance.
» Read more
ISL Engineering had to secure the town’s water source from routine contamination brought on by flooding, thus providing a reliable source of clean drinking water.
» Read more
|
|
|
|
|
|
| |