|
|
|
|
|
January 26, 2019 |
|
|
The system, which uses Schneider Electric Canada’s EcoStruxure Platform, was designed by PBX Engineering and installed by Houle Electric.
» Read full article
Trudeau spoke to the association’s board of directors, corporate partners and stakeholders at its Powering Partnerships dinner at the National Arts Centre in Ottawa.
» Watch video
Major players in Sarnia’s petrochemical industry demand a high level of electrical safety certification.
» Read full article
The 27th edition of the OESC has been finalized with updates, is now available for purchase and will come into regulatory effect on May 16.
» Read full article
The conversion began in September and is expected to take three years to cover the entire metropolitan area.
» Read full article
Deep Earth Energy Production’s new facility near Estevan, Sask., will turn heat from the Earth’s crust into electricity.
» Read full article
“We are very excited for our first location in the Alberta marketplace,” says Rick Campbell, the company’s president.
» Read full article
Catherine Roome is a professional engineer who has held leadership positions in the utility, energy and telecommunications industries.
» Read full article
CSA Group reports the manufacturer recently recalled certain models of its hammer drills and drill/drivers, following a report of injury in the U.S.
» Read full article
Hodgson began his career with Weidmüller more than 17 years ago as a sales representative in Alberta and rose to regional sales manager for the province.
» Read full article
|
|
|
|
|
|
| |