Ontario has requested proposals from pre-qualified teams to design, build and finance 18 kilometres of Highway 401 in Mississauga, Ont. and Milton, Ont. The stretch of highway from Credit River in Mississauga to Region Road 25 in Milton will be widened to improve traffic flow.» Read More
The Windsor-Detroit Bridge Authority (WDBA) has selected Parsons as the owner’s engineer for the Gordie Howe International Bridge Project. The bridge will connect Windsor, Ont. with Detroit, Mich.» Read More
Get ready for three seasons of bridge reconstruction on one of the busiest river crossings in Edmonton. The city has announced plans for total reconstruction of the Groat Road Bridge. Work begins this spring and will go into the 2020 summer construction season.» Read More
The Bobcat T595 compact track loader is part of the M2-Series line of compact loaders featuring durability and performance enhancements that provide operators increased uptime, improved visibility and a more comfortable cab.» Read More
The Doosan DL280-5 wheel loader provides operators with enhanced performance and comfort, as well as increased uptime protection. The new model’s wide fin radiator provides more effective cooling with larger fin spacing, which reduces clogging.» Read More