Optimised cycle time results in specific and measurable benefits that lead to greater production flexibility.
Reduced energy costs per moulded part
Lower operating costs
per moulded part
Increased
productivity
ONE APPROACHFOR MANY APPLICATIONS
THE BETTER THE THERMOREGULATION, THE MORE FLEXIBLE THE PRODUCTION
Choosing high flow and high pressure temperature controllers is a strategic move in optimising the overall cycle time. Achieving both high flow rate and high pressure allows you to reduce mould heating time [...]