Hospital construction stands as one of the most complex challenges in the built environment, where MEP systems must integrate flawlessly within exacting tolerances.
For Pitt Meadows Plumbing (PMP), the Cariboo Memorial Hospital Redevelopment Project in Williams Lake, British Columbia, showcases the strength of their manufacturing-based construction approach executed with precision.
Revizto became the connective tissue across teams, transforming workflows from pre-design through construction. With automatic model synchronization across all devices, fabricators in the shop, superintendents in the field, and BIM coordinators in the office worked from the same up-to-date information every single day.
“As a site superintendent, the thing I like most about Revizto is the collaboration with the other trades and the coordination that we're able to get on the spot. We’re all able to get together to organize it, coordinate it, and get back out and do our jobs properly.” — Tyler Kirkland, Mechanical Superintendent, Pitt Meadows Plumbing.
Watch the case study to learn how the team benefited from greater clarity, faster coordination, and a more controlled path to delivering complex healthcare infrastructure.
|